Kanalo - Dizainas - Gamyba - Montavimas - Dekontaminacija
Ductwork Design & Installation - Onsite Ductwork Fabrication
A Fume Cupboard Extraction System. should be designed, installed to run efficiently, safely and with the minimum of noise levels. To achieve these requirements all our extract and duct work systems are designed, installed, and commissioned to meet the requirements of H.V.A.C. DW154 (Plastic duct work specification), and B.S. E.N. 14175. Extract systems to serve educational style fume cupboards will meet standards set out in Building Bulletin 88 or B.S. E.N. 14175.
At the fume cupboard company, we try and hot air weld as much of the ductwork as possible this prevents leakage and sustains the integrity of the joints for the duration of its life. We provide a variety of different duct materials these consist of: Chemically resistant P.V.C | Polypropylene | Galvanized Metal. For extra protection we can also make glass reinforced plastic (GRP) and fire retardant coating for this duct work.