Produktai skirti 5140 skystas molis (2)

EG 91 : Epoksidinė-poliuretano dviejų komponentų, tiksotropinė, elastomerinė sandarinimo medžiaga

EG 91 : Epoksidinė-poliuretano dviejų komponentų, tiksotropinė, elastomerinė sandarinimo medžiaga

EG 91 Epoxy-polyurethane two-component elastoplastic and thixotropic sealant, for joints subject to traffic, where Shore A Hardness Scale = 65. The elongation-at-break is 70%. To be applied with a trowel or extruded into the suitably-taped sections of the joint (to protect adjacent surfaces). Resistant to contact with hydrocarbons (gasoline and diesel fuel). Horizontal sealing of joints in industrial flooring, even in the presence of chemical attacks and stresses from average-heavy traffic. Vertical sealing of joints in concrete works and products. The application and containment surfaces (joint walls) should be clean, dry, conveniently prepared and adequately resistant: free from dust, grease, soiling, crumbling and/or non-adhering parts and dry. The application surfaces must also be preliminarily treated with Protech Flex Primer. Add component B to component A taking care to pick up all the material contained in the packs, mix thoroughly with a mixer at a low number of revolutions, until a perfectly homogeneous mix is obtained; add the required load amount (component C) continue to mix until a perfectly homogeneous mixture is obtained, indicated by the uniform colour of the mixture. Apply the product mixed by trowelling or with extrusion guns. Do not apply with temperatures below + 5°C or higher than + 35°C and in the presence of surface stagnant water. Approximately 1.25 kg of EG 91 per cubic decimetre of joint volume to be sealed (1250 kg per cubic metre). Packaging: Kit of 5+2.5 kg UM: €/kg
CATA 83 NW NORMAL 50GR UN - Silikono Liejimo Produktai

CATA 83 NW NORMAL 50GR UN - Silikono Liejimo Produktai

REFERENCE : DOWCA8350GR catalyseur du 3483.5% en poids CATA 83 NW en 50GR ....... UN CATALYSEUR 83 STANDARD ;pour SILASTIC 3483. DOSAGE 5% en poids. couleur:blanc TEMPS DE TRAVAIL:90/120min TEMPS DE POLYMERISATION:24 HEURES